COLUMBUS — The Ohio Power Siting Board (OPSB) approved the construction of a 250-megawatt natural gas fired electric generation facility in Licking County. The Socrates the Younger (STY) Power Generation Facility will operate “behind-the-meter” to serve the electric load of an adjacent data center and will not be physically connected to the electric power grid. […]
